Title How to do before the vertical roller mill
Description

When we use the mining equipment, in order to reduce production problems such as failure, it will be some norms of its operation and reasonable maintenance, in the switch before it will carry out the necessary operations, of course, some we do not Can be carried out, then for the vertical roller mill, before the shutdown, what do not do?

When we use the mining equipment, in order to reduce production problems such as failure, it will be some norms of its operation and reasonable maintenance, before switching machine will carry out some of its necessary operations, of course, some we can not Operation, then for the vertical roller mill, before the shutdown, what do not do?

We have previously described the correct order of the mills when they are powered on and shut down. Failure to do so in a sequence is likely to cause problems, but with the exception of a specific sequence, when the mills are down, there are Some necessary operations can not be carried out.

  • The first point is the body and spindle temperature did not drop before the normal temperature, can not turn off the cooling water, or else high temperature will cause greater damage to these components, which is one of the things you can not do;
  • The second point is vertical roller mill system, the auxiliary machine parking, the valve to be closed, the recorder switch should be closed, the purpose of doing so in order to make the entire machine in a state of power, safer;

The article mainly introduces the vertical roller mill do not do things before the shutdown, mainly two points, the above analysis is relatively clear, so the operation is to better ensure the safety of the equipment, in order to better invest next time in production.